417 LAB ACTIVITY 3:
Using System Architect to Prepare a Work Breakdown Structure Chart
WHY:
This activity is designed to introduce the CASE tool System Architect and allow you to
discover how to use it. We will be using this tool throughout the development of the project
milestones. Saint Mary's has a license for four copies of System Architect, accessible through the
network on all PCs.
LEARNING OBJECTIVES:
- Discover diagram building features of System Architect.
- Gain better understanding of the deliverables of a systems
analysis and design project and how
they are related.
- Discover how to use a new piece of software given minimal
instructions.
PERFORMANCE CRITERIA:
- Quality of the answers to the Critical Thinking Questions.
- Completeness
- Clarity
- Depth
- Facility with which you can use System Architect.
RESOURCES:
- System Architect Help;
- System Architect Manuals;
- On-Line Structured Systems Analysis and Design
Tutorial;
- 60 minutes
PLAN:
- Choose roles if you have not already done so.
- Login as xlwin1, xlwin2, xlwin3, or xlwin4, depending on your
team number.
- By right clicking on Network Neighborhood, map the Z: drive to
\\DIAMOND\CPSC. Do
not check the "Reconnect at Login" box.
- Launch System Architect. Use the audit ID team1, team2, team3, or
team4.
- Draw a Work Breakdown Structure Chart using the Decomposition
Diagram facility in
System Architect which reflects the relationships in the model below.
- Answer the Critical Thinking Questions.
- When finished, continue working on your unfinished milestones.
MODEL:
Milestone Deliverable Depends on
1 Project Proposal ------
2 Project Scope Project Proposal
3 Objectives and Constraint Matrix Project Proposal
4 Context Diagram Project Scope
5 Entity Relationship Diagram(ERD) Project Scope
6 Data Flow Diagrams(DFD) Project Scope, ERD
7 Project Repository ERD, DFD
8 Normalized ERD ERD
9 Implementation DFD DFD
10 I/O Design Project Repository
11 User Interface Design I/O Design
CRITICAL THINKING QUESTIONS:
1. What are the steps you needed to take to successfully create
the above Work Breakdown
Structure chart? Explain how to do it to someone else?
Math 417 Lab Activity 3 -- Revised 9/10/98
Return to the
List of Activities