Strategic Area II
Cultivate leadership and enhance communication

Details and Timelines index

Text of the Initiatives and actions

The Action Details are on-line in a condensed form [Condensed details of all Area II Actions] and available in expanded form as an MS Word document [Details of all Area II actions MSWord format]

The Sequences of Events (timelines) are in Adobe Acrobat (.pdf) format. They are also available in MS Word format (but the bars in the timelines do not appear). Details on terms used in the timelines are printed below

First-priority Initiatives:

Strategic Initiative 2: Articulate authority and responsibility for decision-making.

Action 2.1: Examine the College governance/committee structure and implement appropriate governance reforms. [Details]
The Sequence of events [Sequence shows actions 2.1-2.5]

Other Initiatives:

Strategic Initiative 1: Enhance and communicate our commitment to the College Mission

Action 1.1:Design a process for further integration of the mission into the life of the College [Details]
The sequence of events

Strategic Initiative 2: Articulate authority and responsibility for decision-making

Action 2.2: Integrate information technology planning into the decision-making structure. [Details]
Action 2.3: Integrate enrollment management into the decision-making structure [Details]
Action 2.4: Increase understanding of professional roles and develop effective relationship between faculty and staff. [Details]
Action 2.5: Increase interaction of College administrators with Faculty Assembly [Details]
The sequence of events[includes Action 2.1]

 

Links to the sequences in MSWord format (these do not display as well)

Action 1.1
Actions 2.1-2.5

Reading the timelines.

Each page of a timeline indicates the sequence of tasks for a particular action or set of related actions for approximately eighteen months (a limit imposed by the need ot make the documents readable) Page 1 covers January 2002 through May 2003.

The timeline can be magnified (using the controls in the Acrobat Reader) to make the text easier to read on screen. It can also be printed (from within the Acrobat Reader).

References to actions use short names and index numbers taken from the "Action details" documents for the four areas. These documents can be accessed through the links at the left of this page.

A "Milestone" is a point at which some activity is to be completed.
A "Dependency" indicates the necessity for completion of another activity (on another timeline) before the marked activity can be carried out.
A "Cross-reference" indicates necessity for coordination with another activity (usually on antoher timeline)

The dates should be read as approximations, since the sequencing of activities is the critical issue. Some activities have been completed, and some will take longer than anticipated - but the sequence is unlikely to change

Top of page

Last update 7/23/03